SURAKARTA (2 November 2022) - The Ministry of Social Affairs and the Ministry
of Public Works and Public Housing (Kemen PUPR) have resumed their cooperation
in building the flat on Jl. Adi Sucipto 41, Kerten Surakarta by carrying out the
groundbreaking / laying the first stone for the construction of the flat.
The flat is designed and will be built as high as five
floors with 62 residential units with a capacity of approximately 100
people.
Secretary of the Directorate General of Social
Rehabilitation, Salahuddin Yahya welcomed the progress of the construction of
the flat.
Yahya said that the presence of this tower has essential meaning because it is a symbol of the presence of the state in
maintaining and providing a decent standard of living for poor citizens. Yahya
reiterated that this flat was built to accommodate various Social Welfare Service
Recipients (PPKS). Therefore, besides having good buildings, accessibility
for persons with disabilities must also be good.
Meanwhile, the Head of the Java III Housing
Provision Implementing Agency, Salahuddin Rasyidi, is paying close attention so
that the synergy of the parties continues during the construction of this Flat.
The construction of the flats started on September 28, 2022, and will be
completed on June 24, 2023.
Because of that, Rasyidi emphasized especially to
the Consultants and Implementing Contractors to maintain work
professionalism, maintain the quality of work, and complete work on time.
The groundbreaking was attended by the Acting Head of
the Integrated Center Prof. Dr. Soeharso Surakarta, Rachmat Koesnadi, Head of
the Central Java Province Housing Work Unit, Head of the Surakarta City Housing
and Settlements Service, Head of the Surakarta City PUPR Service, Head of the
Surakarta City Social Office, Head of the Surakarta City Environment Service, and
Head of the Surakarta City Transportation Service.